Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Arboleda, C A and Abraham, D M (2004) Fatalities in Trenching Operations—Analysis Using Models of Accident Causation. Journal of Construction Engineering and Management, 130(02), 273–80.

Barker, R, Childerhouse, P, Naim, M, Masat, J and Wilson, D (2004) Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design. Journal of Construction Engineering and Management, 130(02), 177–87.

Chan, A P C, Chan, D W M, Chiang, Y H, Tang, B S, Chan, E H W and Ho, K S K (2004) Exploring Critical Success Factors for Partnering in Construction Projects. Journal of Construction Engineering and Management, 130(02), 188–98.

Choi, H, Cho, H and Seo, J W (2004) Risk Assessment Methodology for Underground Construction Projects. Journal of Construction Engineering and Management, 130(02), 258–72.

Hadikusumo, B H W and Rowlinson, S (2004) Capturing Safety Knowledge Using Design-for-Safety-Process Tool. Journal of Construction Engineering and Management, 130(02), 281–9.

Hegazy, T, Elhakeem, A and Elbeltagi, E (2004) Distributed Scheduling Model for Infrastructure Networks. Journal of Construction Engineering and Management, 130(02), 160–7.

Jeong, H S, Abraham, D M and Lew, J J (2004) Evaluation of an Emerging Market in Subsurface Utility Engineering. Journal of Construction Engineering and Management, 130(02), 225–34.

Lingard, H (2004) Work and Family Sources of Burnout in the Australian Engineering Profession: Comparison of Respondents in Dual- and Single-Earner Couples, Parents, and Nonparents. Journal of Construction Engineering and Management, 130(02), 290–8.

Lu, M and Anson, M (2004) Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects. Journal of Construction Engineering and Management, 130(02), 216–24.

Sacks, R, Eastman, C M and Lee, G (2004) Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete Industry. Journal of Construction Engineering and Management, 130(02), 206–15.

Shohet, I M and Perelstein, E (2004) Decision Support Model for the Allocation of Resources in Rehabilitation Projects. Journal of Construction Engineering and Management, 130(02), 249–57.

Stewart, J, Minchin, R E, Jaselskis, E J, Dayal, V and Smith, G (2004) Potential Construction Applications for Thermoset Composite Scrap Material. Journal of Construction Engineering and Management, 130(02), 199–205.

Zhang, X (2004) Concessionaire Selection: Methods and Criteria. Journal of Construction Engineering and Management, 130(02), 235–44.

  • Type: Journal Article
  • Keywords: Infrastructure; Build/Operate/Transfer; Financing; Private sector; Partnerships; Construction industry; financial management; civil engineering; construction industry; public administration; decision making; international collaboration;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(235)
  • Abstract:
    Various innovative public private partnerships (PPPs) have been explored in worldwide infrastructure development in which BOT (build-operate-transfer) is the underlying concept. Selection of the right concessionaire, which is critical to the success of such BOT-type PPPs, depends on the quality of identifying and defining suitable project-specific criteria and the quality of formulating an efficient tender evaluation methodology. A systematic research approach (including literature review, case studies, interview/correspondence, and a structured questionnaire survey) has been adopted to draw experience and learn lessons from international PPP practices and to unearth and refine experiential and expert knowledge from worldwide experts and practitioners. Tender evaluation criteria and methods currently used in diverse types of PPP projects in both developed and developing countries are identified, compared, analyzed, and then generalized.

Zheng, D X M, Ng, S T and Kumaraswamy, M M (2004) Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization. Journal of Construction Engineering and Management, 130(02), 168–76.

Zwick, D C and Miller, K R (2004) Project Buyout. Journal of Construction Engineering and Management, 130(02), 245–8.